Indonesia Engineering Tyre Parts Information GuideIndonesia Engineering Tyre Parts Information GuideIndependent tyre, rim and tyre-part information guidance
Batch, Date and Delivery Records

How can I check whether the tyre date and batch records belong to the delivery I received?

A document and sidewall cross-check guide for inter-island tyre deliveries to Indonesian quarry and palm plantation sites.

Direct answer: You cannot confirm that tyre date and batch records belong to your delivery by matching dates, repeated sizes or similar descriptions alone. You need to link the purchase line, actual sidewall date or lot code, packaging and quantity, delivery list and any report sample identifier to the same supplier document set, then clarify conflicts through the agreed acceptance plan and storage history.

This article is general independent information for equipment users in Indonesia. It is not an official manufacturer site, certification body or testing platform.

1. What 'belongs to the delivery' must mean

A physical tyre belongs to a delivery record when the identifiers on the tyre, the delivery document line, the purchase order line, the packing list and the supplier's batch record can be traced to the same documented transaction or lot.

A matching size such as 29.5R25 or a matching sidewall date is not enough by itself. Many tyres in a shipment may share the same size and production week, but still come from different lots, warehouses or customer allocations.

2. Start with the purchase line and delivery list

For an inter-island delivery to a quarry or palm plantation, compare these documents before accepting the batch:

  • purchase order number and line item;
  • tyre size, pattern, ply or star rating if shown;
  • quantity per line;
  • delivery order number and date;
  • packing list lot, batch or date code;
  • transporter or vessel receipt.

The delivery list should repeat the same lot or batch reference from the purchase line or supplier batch record. If it only repeats the tyre size, ask the supplier to add the lot or batch identifier.

Sidewall reading

Ask the supplier or manufacturer to point to the complete sidewall code that is used as the lot, batch or date reference for that specific tyre.

Many earthmover tyres have a DOT sidewall marking with a date group, but a date group is not automatically the same as the supplier's batch or lot code. Do not assume that a visible date alone proves the delivery line.

Packaging and quantity

Check that the quantity received matches the delivery list and invoice line. Labels on wrapping, bales or pallets may contain lot numbers or date codes.

A missing or damaged label is a documentation gap, not automatic proof of wrong delivery. Record the missing label in the acceptance note and ask the supplier for the corresponding batch record.

3. Compare any report sample identifier

If a batch certificate, quality report or test summary is given, the sample identifier in that report must match the purchase order line item, delivery line or lot number.

A report that merely mentions the same size, pattern or general product name does not establish a batch link. Ask how the sample identifier was assigned and how it connects to the specific containers, bales or tyres you received.

4. Clarify conflicts without accusing

If the sidewall date or lot code does not match the delivery document, ask the supplier to explain what each date means in their system.

Dates can refer to production week, cure date, batch completion, invoice date, port departure or delivery date. A difference may be a legitimate difference in date fields, but it must be explained and documented.

Ask about storage history before and after inter-island transport. For example, stock may have been stored in a supplier warehouse, port warehouse or site laydown area. Storage records help show whether the delivered tyres were the same allocated lot or whether mixed stock entered the delivery.

Do not accuse the supplier when a mismatch appears. State the conflict briefly, list the documents compared, and request a written explanation or corrected document set.

5. Missing evidence that prevents a batch conclusion

A batch link is incomplete without these items:

  • actual machine or vehicle model and suffix;
  • machine serial number and axle position if the tyre is fitted or assigned to a machine;
  • complete sidewall code from the received tyre;
  • rim or component identity where applicable;
  • delivery order and packing list;
  • invoice or purchase line;
  • supplier batch record or certificate;
  • clear photographs of the sidewall code and label from the received tyre.

Photographs and supplier statements are useful but are not proof of every claim. They must be checked against the physical tyre and the supplied records.

6. Procurement next step

If you cannot link the delivery records to the received tyres, send a written clarification request to the supplier.

Include the purchase order number, delivery list line, sidewall code from the actual tyre, packing list reference and any report identifier. Ask the supplier to confirm in writing which lot or batch was allocated to your delivery and to provide the supporting batch record.

Only the responsible parties, such as the purchaser, site engineer, fleet owner or designated acceptance officer, decide whether to accept or reject the delivery. This article does not make that decision.

Do not instruct tyre mounting, inflation, demounting, chemical treatment or hazardous testing based on this information. Such actions require the applicable tyre-maker procedures and trained personnel.

MechLink as an optional records organiser

If your team needs help arranging delivery lists and sidewall photographs for supplier clarification, MechLink can act as an external records organiser.

This is a commercial third-party role. MechLink cannot authenticate a batch, certify a tyre or release a delivery for use. WhatsApp only: +62 81292273888, not an official manufacturer phone.

No guarantee of availability, price, fitment, life or delivery is made through this contact.

7. Keep separate conclusions separate

Keep these questions separate:

  • fitment to a specific machine and axle;
  • physical condition and safe use;
  • batch quality or sample results;
  • source or provenance;
  • delivery record match;
  • final acceptance.

Model, size, photos and supplier statements alone do not confirm fitment, batch quality, provenance or safe use.

Use only inspected and applicable manuals, catalogues, manufacturer documents or supplied records. If a document is not available, state that it is inaccessible and do not invent a standard, report number, reading or certification.

No age limit, service life conclusion or sample size should be inferred from this general article.

Sources

No external manufacturer-specific standards, certificates, inspection reports or tyre-maker documents were supplied or accessed for this article. The checks above are based on general procurement document reconciliation and sidewall identification principles.