Pre-purchase Tyre Evidence Checklist

What should I ask for before buying mixed tyres, rims, tubes, flaps and valves for an Indonesian project?

A line-by-line procurement checklist for quarry, mine, palm plantation and roadwork fleets: machine identity, candidate specification, rim data, delivered condition, batch reference and written terms.

What should I ask for before buying mixed tyres, rims, tubes, flaps and valves for an Indonesian project?

Before buying, ask for a line-item evidence pack. Each order line should show the machine model and suffix, serial number or fleet unit, axle position, existing sidewall or component markings, rim identity, candidate specification, delivered condition photo, batch or date code, and any agreed dimensional, material, storage or test document. A quotation that only lists size and brand is not enough. Ask the supplier to connect written evidence to the specific line item, not to a generic certificate folder.

This is an independent third-party engineering-tyre information guide for Indonesia, not an official manufacturer site, authorised dealer, service centre, certification body or testing platform. It is a pre-purchase tyre evidence checklist.

1. Start with machine and axle identity, not just tyre size

Why model alone is not enough

A machine model and suffix may share a nameplate but different axle loads, rim options, steering or trailer positions. The same tyre size can be fitted to different rim widths and axle positions with different load and speed requirements. Model alone never confirms fitment, batch quality, provenance or safe use.

Information to request for each line

For each procurement line, request the following:

  • machine make, model, suffix, serial number or fleet unit number;
  • axle position: steer, drive, trailer, tag, scraper, grader, loader or other station;
  • existing tyre size and service description from the complete sidewall, where service description means the load index and speed symbol shown on the sidewall;
  • existing rim size, width, flange type, offset and mounting type if visible;
  • tube, flap and valve markings from the removed or still-fitted assembly, if available;
  • dated photos of the old parts before removal, showing sidewall, rim stamping and any visible damage.

This links the purchase to a physical machine position. It also prevents a buyer from accepting a substitute size or rim profile that only looks similar.

Procurement check if missing

If any line has only a tyre size or a generic machine name, ask the fleet supervisor or maintenance lead to complete the machine and axle identity before comparing offers. Do not let the supplier fill in a missing serial or axle position without confirmation from the asset register or a visible machine photo.

2. Ask for candidate specification and rim identity before order confirmation

Candidate tyre sidewall data

Ask the supplier to state the exact candidate sidewall marking, not only a marketing name. This includes size, load index or ply rating, speed symbol, application code such as loader, grader, port or mining, and any manufacturer pattern or compound code visible on the sidewall. A load index is a code number for a tyre's load capacity at a reference speed. A ply rating or load range is a strength category, not always the physical number of plies. A pattern name alone is not a specification. Compare the candidate marking with the existing sidewall or the machine manufacturer documentation.

Rim, tube, flap and valve marking set

For rims, request the stamped rim size, width, profile or flange code, offset and disc thickness where visible. For tubes, flaps and valves, request visible markings, material type, size range and valve length or bend if the assembly uses long or angled valves. Do not assume a tube or flap marked for a similar size is correct for a different tyre and rim. Tube, flap and valve markings are candidate identity, not proof of compatibility by themselves. They need to be checked against the tyre and rim assembly.

Old-part photos and existing assembly evidence

Request photographs of the old tyre sidewall, rim stamping and tube, flap or valve markings before removal if the machine is still operating. Old-part photos help match replacement components to the removed assembly, but a photo is not proof. It is a lead to confirm the markings and dimensions.

3. Request delivery-condition and batch-reference evidence at quotation stage

Delivered condition and visual record

Ask the supplier to provide a dated delivery record that includes a line-by-line photo or inspection note for each item. The photo should show the actual item marking, sidewall or stamping, and any packaging label. A stock photo is not delivery evidence. A supplier statement that goods are new is not proof. Request a written statement of delivered condition plus photos, but keep the acceptance decision with the responsible fleet or engineering representative.

Batch, lot and date code handling

For tyres, ask for the manufacturer date code and any batch or serial reference visible on the item. For tubes, flaps and valves, ask for batch, lot, material or date markings where available. Batch reference helps compare the delivered item with the quotation and with any sample or certificate later. But batch reference alone does not prove a part is suitable. It only creates traceability.

Dimensional checks that may be agreed

The buyer and supplier may agree in writing which dimensions will be checked at delivery. Examples include rim width, bead seat diameter, valve hole position, tube size range or flap size range. Do not ask the supplier to perform mounting or inflation checks. Dimensional verification should be visual or measured only where the responsible party accepts the method.

4. Separate provenance, adaptation, sample results and acceptance

Provenance vs batch acceptance

Provenance means where the item came from, such as manufacturer, importer, distributor or project stock. Batch acceptance means the buyer decides whether a delivered batch is accepted for the stated application. Keep these separate in the request. A document may show the tyre came from a known manufacturer or distributor, but that does not automatically mean the delivered batch is accepted for the specific machine and axle.

Sample results and certificates

If a supplier offers a sample test report or certificate, ask which batch, item serial or date code it covers. A generic certificate folder does not link to your order line. Request that the certificate reference the batch or item marking you will receive. If it cannot be linked, treat the certificate as supporting information only, not as acceptance evidence. Never accept a report number or test reading that is not attached to the actual item marking.

Adaptation and equivalence claims

If a rim, tube, flap or valve is described as adapted, interchangeable or equivalent, ask for the exact dimensional or material comparison in writing. Keep adaptation claims separate from provenance and batch acceptance. A written equivalence statement is not proof until the responsible engineer checks it against the existing assembly and any applicable manufacturer document.

5. Use a thin item-to-record link, not a thick document pack

Why a thick pack fails

A large PDF pack may contain many certificates, brochures and general data sheets, but none may match the specific order line. A thick pack can still lack an item-to-record link. Request a compact line-item list instead: one line per item, with machine identity, existing marking, candidate marking, rim identity, batch reference and attached file name or photo reference.

What to put in the line-item request

A useful request to the supplier is:

  • line number;
  • machine model, suffix, serial or fleet number;
  • axle position;
  • existing size and service description;
  • rim stamped size, width and profile if applicable;
  • candidate tyre, tube, flap or valve marking;
  • dated photo or delivery record reference;
  • batch or date code if visible;
  • stated country of manufacture, importer or distributor if relevant to the project;
  • any written term still open.

Not every item needs identical evidence. For example, a flap may need marking and size range, but not a full data sheet. A rim may need the stamped profile and condition, but not the same batch certificate as a tyre. The key is that each line carries the evidence relevant to that component.

Procurement next step

Send the supplier a standard request by purchase enquiry or through a managed channel if one is used. An external enquiry service can help organise single-item or batch candidate-specification requests, but such a service is commercial and independent, not official. It cannot guarantee authenticity, fitment, stock, price, life or delivery. Current stock and delivery information must be requested in writing and dated. For example, MechLink is an external commercial third party in Indonesia that can help organise the questions, not an official authority or warranty source. WhatsApp only: +62 81292273888. Do not treat any statement from it as proof of fitment, stock, price or delivery.

6. Missing evidence and dated written terms

Missing evidence questions

Before purchase, ask these unresolved questions in writing:

  • Which line items still lack machine or axle identity?
  • Which existing sidewall or rim markings are unreadable or not photographed?
  • Which candidate specification is incomplete, such as missing load index, speed symbol or rim width?
  • Which tube, flap or valve size range is not stated?
  • Which batch or date code cannot be read from the item or packaging?
  • Which certificate or report cannot be linked to a visible item marking?
  • Which delivered condition statement is based on a stock photo rather than the actual item photo?
  • Which supplier statement is only verbal?

Request missing evidence before order confirmation. If the evidence is not available before order, ask for a dated written condition that the supplier will provide line-item photos, markings and any batch reference before or at delivery, with responsibility for acceptance remaining with the buyer.

Dated written terms to include

Write these terms into the enquiry or purchase order:

  • supplier must provide a line-item marking and photo reference for each delivered tyre, rim, tube, flap and valve;
  • stock, price, life or delivery lead-time claims must be given in writing and dated by the supplier, not promised verbally;
  • no model, brand or generic certificate is accepted as proof of fitment, batch quality, provenance or safe use;
  • the buyer or responsible engineer decides acceptance after visual and dimensional verification;
  • adaptation, provenance, sample results and batch acceptance are recorded as separate items;
  • if an item marking is not legible at delivery, the buyer may request replacement or written clarification before use.

Do not turn this into mounting or inflation instruction

This checklist covers procurement evidence only. It does not instruct inflation, mounting, demounting, repair or hazardous testing. Those steps are for the responsible tyre service provider, fleet engineer or manufacturer guidance, not for this purchase checklist.